Compteur d'Eau

Electricity - French regulations & supplies; Insulation, Brickwork, Roofs, Joinery, Flooring, etc
Message
Author
Lori
Posts: 1525
Joined: Mon May 09, 2022 7:08 pm
Location: Dordogne

Compteur d'Eau

#11 Post by Lori »

L Austin France wrote: ↑Tue Nov 03, 2026 7:22 pm Apparently he will be changing our barn emplaced meter for a a 'Linky' type remote reading job.
I hope yours works.

We had ours replaced by the remote read meter in early 2024. Problem was/is the wave emitted from the new meter cannot reach the wand/apparatus used by Veolia when they drive by to record it; which they still have to do.

So, our first facture with the new meter showed we used 8m3 of water for a six month period ... It has taken me 2 years to get Veolia to acknowledge the problem; which they now have.

However, the new meter still doesn't do it's 'remote reading' job. I still have to read and take a photo of our meter every six months in order to get an accurate facture. Which, of course, means I have to remember when to do that as you only have about a two week period to report the reading. Otherwise, you get an estimated facture.

One of the most annoying 'updates' we have made at this house.

L Austin France
Posts: 2238
Joined: Sat Sep 04, 2021 1:47 pm
Location: sw 29

Compteur d'Eau

#12 Post by L Austin France »

Lori wrote: ↑Wed Nov 04, 2026 9:29 am
L Austin France wrote: ↑Tue Nov 03, 2026 7:22 pm Apparently he will be changing our barn emplaced meter for a a 'Linky' type remote reading job.
I hope yours works.

We had ours replaced by the remote read meter in early 2024. Problem was/is the wave emitted from the new meter cannot reach the wand/apparatus used by Veolia when they drive by to record it; which they still have to do.

So, our first facture with the new meter showed we used 8m3 of water for a six month period ... It has taken me 2 years to get Veolia to acknowledge the problem; which they now have.

However, the new meter still doesn't do it's 'remote reading' job. I still have to read and take a photo of our meter every six months in order to get an accurate facture. Which, of course, means I have to remember when to do that as you only have about a two week period to report the reading. Otherwise, you get an estimated facture.

One of the most annoying 'updates' we have made at this house.
I've been wondering if it's 'signal' will penetrate our stone & crinkly tin barn walls.

Post Reply